النتائج (
الإنجليزية) 2:
[نسخ]نسخ!
The Contractor shall have the responsibility to take all the required arrangements and conduct follow-up and coordination necessary for the project with all governmental bodies in all regards to the project, including, but not limited to, the follow-up service delivery to the site as services of electricity, telephone, water, sanitation, drainage of flood water, etc. . Amavh to ensure that the requirements of this Alkhaddmatn including electricity available in the area matching the effort and all the service requirements with engineering plans, and make any engineering modifications, if necessary. The ministry bear the delivery of services for the site fee costs
يجري ترجمتها، يرجى الانتظار ..
