النتائج (
الإنجليزية) 1:
[نسخ]نسخ!
The way pattens to drill rig consists, described in French literature as (), and the method of work is the drill hole risk trial diameter of a given depth by using manual drilling rig, then Nmli each hole to the top with water, every five minutes for a period of twenty minutes to make sure the soil has become saturated completely .fima after Nbde measured the leakage rate depending on the water drop from the surface and using a clock to measure to measure the time and procedure are included for measuring the distance () between the falling water surface and the top of the hole and stop compared when the flow rate (almost constant rate of water descent). Taking into account the effect of the decrease in the quotient attributed as a result of temperature and wind speed.
يجري ترجمتها، يرجى الانتظار ..