النتائج (
الإنجليزية) 2:
[نسخ]نسخ!
Petroleum Engineer 1 OBJECTIVES
This unit's objective is providing a general list for the activities or items that shall be check before the startup of the plant. It Also Provide a planning practice for the a pre- lands check startup safety scanner checks of the the sms_root_directory, knowing the items required to a guaranty of That all the Sms_root_folder construction was Developed color : as per design specification. . Start-up a pre-checks Objectives are On : • Revision of System Protection - Interlocks / ESD's • Operation & Maintenance & Safety system / Procedures / Documentation • Training & its Effectiveness 2 fACILITIES The minimum facilities to lands check before start-up are On the Following: • Implementation of Work permit system • Firefighting facilities Including positioning of extinguishers, etc • Trade shows All Necessary safety scanner equipment available • Clearly defined emergency exits • tested Paging systems & - availability of Walkie-talkies • Verify the Implementation of isolation scheme • Properly Stenciled utility points with connecting hoses / Lancers • Trade shows All gas / hydrocarbon detectors are on tested and kept on • ESD tested, documented and kept activated, etc • Flare system is in position • Best leak test is at operating severity • Water / Condensate draining from all Low Shoes points after gas backing up • Condensate draining before charging steam headers • Utilities Tanks Filling • Spectacle Blind in the correct position • Trade shows all safety scanner valves, Including TSV's are On in line 3 SAFETY iTEMS The minimum safety scanner items to lands check before start-up are On the Following: • Necessary safety scanner clothing of used by vBulletin® all personnel at site • Guidelines for handling by dangerous materials are On available • by spark- <br> free Make tools available at site • F & G alarm systems functioning properly • Verify eye drops are On available • Trade shows All gratings Firmly anchored
يجري ترجمتها، يرجى الانتظار ..
