This unit’s objective is providing a general list for the activities or items that shall be check before the startup of the plant. It also provide a planning practice for the pre-check startup safety checks of the platform, knowing the items required to guaranty that all the Platform construction was developed as per design specification.

Start-up pre-checks objectives are:

• Revision of System Protection – Interlocks/ ESD’s

• Operation & Maintenance & Safety system / Procedures /Documentation

• Training & its effectiveness

2 FACILITIES
The minimum facilities to check before start-up are the following:

• Implementation of Work permit system
• Firefighting facilities including positioning of extinguishers, etc
• All necessary safety equipment available
• Clearly defined emergency exits
• Tested Paging systems & availability of Walkie–talkies
• Verify the implementation of isolation scheme
• Properly stenciled utility points with connecting hoses / lancers
• All gas / hydrocarbon detectors are tested and kept on
• ESD tested, documented and kept activated, etc
• Flare system is in position
• Best leak test is at operating severity
• Water/Condensate draining from all low points after gas backing up
• Condensate draining before charging steam headers
• Utilities Tanks Filling
• Spectacle Blind in the correct position
• All safety valves, including TSV’s are in line

3 SAFETY ITEMS
The minimum safety items to check before start-up are the following:

• Necessary safety clothing used by all personnel at site
• Guidelines for handling dangerous materials are available
• Make spark-free tools available at site
• F&G alarm systems functioning properly
• Verify eye drops are available
• All gratings firmly anchored
0/5000
من: -
إلى: -
النتائج (الإنجليزية) 1: [نسخ]
نسخ!
Petroleum engineer 1 OBJECTIVESThis unit's objective is providing a general list for the activities or items that shall be check before the startup of the plant. It also provide a planning practice for the pre-check startup safety checks of the platform, knowing the items required to guaranty that all the Platform construction was developed as per design specification.Start-up pre-checks objectives are:• Revision of System Protection – Interlocks/ ESD's• Operation & Maintenance & Safety system / Procedures /Documentation• Training & its effectiveness2 FACILITIESThe minimum facilities to check before start-up are the following:• Implementation of Work permit system• Firefighting facilities including positioning of extinguishers, etc• All necessary safety equipment available• Clearly defined emergency exits • Tested Paging systems & availability of Walkie–talkies• Verify the implementation of isolation scheme• Properly stenciled utility points with connecting hoses / lancers• All gas / hydrocarbon detectors are tested and kept on• ESD tested, documented and kept activated, etc• Flare system is in position• Best leak test is at operating severity• Water/Condensate draining from all low points after gas backing up• Condensate draining before charging steam headers• Utilities Tanks Filling• Spectacle Blind in the correct position• All safety valves, including TSV's are in line3 SAFETY ITEMSThe minimum safety items to check before start-up are the following:• Necessary safety clothing used by all personnel at site• Guidelines for handling dangerous materials are available• Make spark-free tools available at site• F&G alarm systems functioning properly• Verify eye drops are available• All gratings firmly anchored
يجري ترجمتها، يرجى الانتظار ..
النتائج (الإنجليزية) 2:[نسخ]
نسخ!
Petroleum Engineer 1 OBJECTIVES
This unit's objective is providing a general list for the activities or items that shall be check before the startup of the plant. It Also Provide a planning practice for the a pre- lands check startup safety scanner checks of the the sms_root_directory, knowing the items required to a guaranty of That all the Sms_root_folder construction was Developed color : as per design specification. . Start-up a pre-checks Objectives are On : • Revision of System Protection - Interlocks / ESD's • Operation & Maintenance & Safety system / Procedures / Documentation • Training & its Effectiveness 2 fACILITIES The minimum facilities to lands check before start-up are On the Following: • Implementation of Work permit system • Firefighting facilities Including positioning of extinguishers, etc • Trade shows All Necessary safety scanner equipment available • Clearly defined emergency exits • tested Paging systems & - availability of Walkie-talkies • Verify the Implementation of isolation scheme • Properly Stenciled utility points with connecting hoses / Lancers • Trade shows All gas / hydrocarbon detectors are on tested and kept on • ESD tested, documented and kept activated, etc • Flare system is in position • Best leak test is at operating severity • Water / Condensate draining from all Low Shoes points after gas backing up • Condensate draining before charging steam headers • Utilities Tanks Filling • Spectacle Blind in the correct position • Trade shows all safety scanner valves, Including TSV's are On in line 3 SAFETY iTEMS The minimum safety scanner items to lands check before start-up are On the Following: • Necessary safety scanner clothing of used by vBulletin® all personnel at site • Guidelines for handling by dangerous materials are On available • by spark- <br> free Make tools available at site • F & G alarm systems functioning properly • Verify eye drops are On available • Trade shows All gratings Firmly anchored






































يجري ترجمتها، يرجى الانتظار ..
النتائج (الإنجليزية) 3:[نسخ]
نسخ!
1 OBJECTIVES Petroleum EngineerThis unit s objective is providing a general list for the activities or items that shall be check before the startup of the plant. It also provide a planning practice for the pre-check startup safety checks of the platform, knowing the items required to guaranty that all the Platform construction was developed as per design specification.Start-up pre-checks objectives are:Revision of System Protection Interlocks / ESD sOperation & Maintenance & Safety system / Procedures / DocumentationTraining & its effectiveness2 FACILITIESThe minimum facilities to check before start-up are the following:Implementation of Work permit systemFirefighting facilities including positioning of extinguishers, etcAll necessary safety equipment availableClearly defined emergency exitsTested Paging Systems & availability of Walkie talkiesVerify the implementation of isolation schemeProperly stenciled utility points with connecting hoses / LancersAll gas / hydrocarbon detectors are tested and kept onESD tested, documented and kept activated, etcFlare system is in positionBest leak test is at operating severityWater / Condensate draining from all low points after gas backing upCondensate draining before charging steam headersUtilities Tanks FillingSpectacle Blind in the correct positionAll safety valves, including TSV s are in line3 SAFETY ITEMSThe minimum safety items to check before start-up are the following:Necessary safety clothing used by all personnel at siteGuidelines for handling dangerous materials are availableMake spark-free tools available at siteF&G alarm systems functioning properlyVerify eye drops are availableAll gratings firmly anchored
يجري ترجمتها، يرجى الانتظار ..
 
لغات أخرى
دعم الترجمة أداة: الآيسلندية, الأذرية, الأردية, الأفريقانية, الألبانية, الألمانية, الأمهرية, الأوديا (الأوريا), الأوزبكية, الأوكرانية, الأويغورية, الأيرلندية, الإسبانية, الإستونية, الإنجليزية, الإندونيسية, الإيطالية, الإيغبو, الارمنية, الاسبرانتو, الاسكتلندية الغالية, الباسكية, الباشتوية, البرتغالية, البلغارية, البنجابية, البنغالية, البورمية, البوسنية, البولندية, البيلاروسية, التاميلية, التايلاندية, التتارية, التركمانية, التركية, التشيكية, التعرّف التلقائي على اللغة, التيلوجو, الجاليكية, الجاوية, الجورجية, الخؤوصا, الخميرية, الدانماركية, الروسية, الرومانية, الزولوية, الساموانية, الساندينيزية, السلوفاكية, السلوفينية, السندية, السنهالية, السواحيلية, السويدية, السيبيوانية, السيسوتو, الشونا, الصربية, الصومالية, الصينية, الطاجيكي, العبرية, العربية, الغوجراتية, الفارسية, الفرنسية, الفريزية, الفلبينية, الفنلندية, الفيتنامية, القطلونية, القيرغيزية, الكازاكي, الكانادا, الكردية, الكرواتية, الكشف التلقائي, الكورسيكي, الكورية, الكينيارواندية, اللاتفية, اللاتينية, اللاوو, اللغة الكريولية الهايتية, اللوكسمبورغية, الليتوانية, المالايالامية, المالطيّة, الماورية, المدغشقرية, المقدونية, الملايو, المنغولية, المهراتية, النرويجية, النيبالية, الهمونجية, الهندية, الهنغارية, الهوسا, الهولندية, الويلزية, اليورباية, اليونانية, الييدية, تشيتشوا, كلينجون, لغة هاواي, ياباني, لغة الترجمة.

Copyright ©2024 I Love Translation. All reserved.

E-mail: