النتائج (
الإنجليزية) 2:
[نسخ]نسخ!
5- Set the steamer: <br>A- The seller must disclose the buyer to the designation of the selected ship for shipment within five days, before the start of the shipment and send the specifications of the ship (Q88) for acceptance by the buyer, provided that coordination is made in the event of any change to the selection of another vessel. <br>B- Ships with a payload of 65 thousand tons, 11.50 meters and 235 meters long can be used, and if the submersible exceeds these measurements, aden refineries will provide the appropriate berth if available, provided that the delay is not borne in waiting for the marina, and in all cases the ship carrying the cargo must be suitable In size and measurements with the marinas available in the ports of Aden and oil refineries in the Republic of Yemen.
يجري ترجمتها، يرجى الانتظار ..
