النتائج (
الإنجليزية) 2:
[نسخ]نسخ!
3.2.1 Petroleum Engineer NA / Q PIII Sms_root_folder Information
This paragraph summarizes all the technical information Necessary to take knowledge of the process and utilities units installed on NA / Q PIII gas the sms_root_directory of the Abu Qir gas Field. The the sms_root_directory NA / Q PIII was constructed with the aim to increase exploitation capacity of Abu Qir field. The platform has been designed to accommodate 6 (six) wells (12 strings) and receive the well heads production of NA / Q PII. Has been the sms_root_directory The designed in order to Accommodate 12 (twelve) strings color : as FOLLOWS: - well "NA / Q PIII-1,3,4,5,6": double completion ( a pre-drilled), both strings dedicated to gas production ; - well "NA / Q PIII-2": double completion ( a pre-drilled), one 's string dedicated to gas and oil production to one 's . They 're are On unmanned type. The the sms_root_directory is designed to operate a maximum of 12 stings at time. NA / Q PIII the sms_root_directory is a minimum facilities type and it is connected to the existing the sms_root_directory NA / Q PII and A / Q PI in order to Receive and to send the well heads production respectively. For this reason a 16 "sea line - 2,8 km long imports production from NA / Q PII field.
يجري ترجمتها، يرجى الانتظار ..
