النتائج (
الإنجليزية) 1:
[نسخ]نسخ!
The project included the establishment of an integrated self-sustaining network for electricity to provide power for the operation of all facilities to the fullest since been supplying generators with a capacity of College (1,300) and it has an extension of electrical cables, terrestrial and linked to all buildings and facilities with the paintings and home.
يجري ترجمتها، يرجى الانتظار ..
